PCP&L wasn't the only utility challenged by Winter Storm Riley. Route 2001 in Milford, pictured, was down to one lane last Thursday as much-needed repair work was still underway by crews for Met-Ed. The utility estimated 7,000 customers were still without power a week after the first storm. (Photo by Linda Fields)